Reno works have started here with 3 days of hacking works. We are keeping the existing marble flooring so the contractor has laid the floor protection. There used to be tiles along the door archways which we have hacked all away.
kitchen floor and wall tiles all hacked off and all the cupboards have been removed as well.
started tiling works in the bathroom