This morning, all the tiles are delivered to the void deck because the demolition and hacking works have been completed at our Bishan EM. Tiling works are going to commence soon!!!
Above: the current living soon to be dining area
Above: view of Staircase leading upstairs from the main entrance
Above: Kitchen wall all hacked away! and the carpentry has all been removed.
Above: Current dining area which will be the living area
Upstairs. All the wall and floor tiles removed.