Reno@Hougang Maisonette - Updates this week!
Hi folks, another week has passed! How fast time flies.Here are some reno updates on the Hougang Maisonette.minor plastering and touch up before painting works starts this week.All the glass works have...
View ArticleReno@Kovan Maisonette - 1st Reno update
Here's our first post on the Kovan Reno Update!!!The contractor has been awarded and permit was gotten for last Friday and the workers have been really busy tearing this place down. As you can see, we...
View ArticleReno@Hougang Maisonette - Kitchen laminates
This morning, we passed 4 numbers of laminates (large pieces) to Iron Lady Chef to choose from. It's a final selection from a brochure of numerous laminates and we have zoomed down to the final 4. Hmm,...
View ArticleReno@Kovan Maisonette - Toilet renderings
 option 1 - A very safe and practical design. No fuss and definitely will withstand time. above: a picture where we drew our inspiration from.Option 2: Enter the wooden shower. It's an elegant...
View ArticleReno@TohYi Maisonette - New renders
 here's the couple whose maisonette includes the common corridor area and it's a corner unit. So they have a small passageway which belongs to them before they reach their main entrance. We are...
View ArticleReno@Kovan Maisonette - Walls are up
 view from balcony - all the false ceiling are down, walls hacked, floors hacked, new walls up.View from living looking towards dining, study, secret store and kitchen area.The hollow blocks are really...
View ArticleReno@Hougang Maisonette - Painting works
 Let's start with the upstairs!view of bedroom 3 with the french door openings - the doors and walls have been given a fresh new coat of white paint.Here's a view of the spaciously lit bedroom 3 from...
View ArticleReno@Hougang - Glass werkz
as i was leaving the place, the workers started moving the glass railing for the french door opening!!!
View ArticleReno@Hougang Maisonette - Painting works
Most of the walls, doors and frames have been given a primer and 1st coat of paint. Will need a second coat of paint to even out all the surfaces. With a fresh new coat of paint, it does make the area...
View ArticleReno@Yishun - Toilet updates
Feature wall in common bathSome reno updates on the Yishun flat. All the floor tiles have been finished and covered up with protective covering so there's not much I can take photos of. So here are...
View ArticleReno@Kovan Maisonette - Glass works
Hi there folks!here are some photos of the Kovan Maisonette updates.Some updates on the stairs. The contractor has used large pieces of wood to line up the side of the staircase and the glass railing...
View ArticleReno@Kovan Maisonette - everything at ceiling level: fans, cove lights and...
Above: aircon at master room, can see a short bit of trunking which leads into the aircon unit. It's coming in from the compressor on the right.Above: Aircon in bedroom 3, the trunking is fully boxed...
View ArticleReno@Kovan Maisonette - updates!
Today we went down to settle more carpentry dimensions again now that the glass door is fixed and the box up is completed. Above is the box up (brown) from the living room and photo on the right is...
View ArticleReno@Yishun - Choosing of laminates and pebble wash
guess which packet did the couple choose?although there are only 5 packets here, they took almost half an hour to choose because they were afraid to choose a wrong colour. Imagine when we gave them the...
View ArticleReno@Kovan Maisonette - Main Gate and Main Door
 It's Monday again folks and reno works start again!!!Main Gate installed : Open and closeThe gate is by owner's subcontractor, finished in dark graphite grey. FSM says to have either main door or main...
View ArticleReno@Kovan Maisonette - Staircase updates
Final coat of lacquer is done for the parquet. And the curb is all ready to receive the glass railing and lights.Tic Tack door for the staircase store is finished. Right photo shows the sides of the...
View ArticleReno@Kovan Maisonette - Bathroom updates
Master bath Vanity Bathroom updates. It's wednesday and the carpenter has delivered most of the carpentry to site and the bottom cabinet for the upper floor bathrooms are installed.The TOTO sinks have...
View ArticleReno@Kovan Maisonette - More partitions up for Master and installation of...
So much lights comes through the window that it's quite hard to get a good photo of the door, so nonetheless, here's a zoom in on the veneer pattern which we have chosen for all the bedroom doors. It's...
View ArticleReno@Kovan Maisonette - Pelmet up for glass sliding panels at kitchen counter
huge roll of laminate here!
View Article