Reno@187BB - Hacking completed. Tiles up next.
above: kitchen looks nice and neat! But the other areas still look pretty much a war zone
View ArticleReno@240JE - Bathroom wall tiles up!
it's a Monday and a brand new week. Checking up on the reno progress here. below: hopping over to the other bathroom...
View ArticleReno@725B Maisonette - Staircase Storage Render
thought of posting something animated today.
View Article152TP - General clean up
and we are back 10 days later to see the place all cleaned up!
View ArticleReno@725B Maisonette - Tiles Selection
hues of grey and white. different patterns and textures.
View ArticleReno@187BB - Bathroom updates
floor and wall tiles completed. General plumbing done too.New set of windows installed as well.
View ArticleReno@187BB - Site visit
1st fix electrical wirings have been pulled. Aircon trunking laid as well, so we are here today to go through how to box up the "ugly" areas.The place is much brighter than what it previously was. Once...
View ArticleReno@345W - SIte Visit for carpentry
electrical works are still in progress, however this flat is so huge that even though the partition works have not started out, we are here to go through the carpentry works in advance as there are...
View ArticleReno@187BB - Coordination works for partition works
Electrical 1st fix has gone well underway. Today we are here on site to discuss how to box up the air-con trunking. Above is a photo of the kitchen with dangling wires hanging by the side of the wall....
View ArticleReno@345W - Site visit for partition works
We are here this week as the air-con has been laid and we are here to go through how to box up certain trunking. above: floor screed completed. Last week was still untouched.Going to lay parquet later.
View Article152TP - Aqua Main Door
ever thought of having a splashing colour for your main door?For this home, we are trying out a new colour!check out our other homes which have fire engine red main doors!104LT Maisonette - Red DoorH3...
View Article152TP - Ambient lighting for vanity bottom cabinet
warm lights does make a difference to the overall feel of a space.
View Article152TP - Bathroom updates
toilet bowl installedfaucets and basin installedshower tap and mixer installedlights installed
View Article152TP - Flooring completed!
click here to see photos before the flooring was up. Makes such a difference!
View Article